E2W


E2W FEATURES & BENEFITS

GMP COMPLIANCE:
Intended for use with ethanol and botanical extracts
Process: Dissolution, mixing, precipitation, filtration, solvent recovery
Containment: Contained process
Lubricants: None in direct contact. No contact with process fluids
PLC GAMP5: Category 3
Materials Traceability & Manufacturers’ DOC for Contact Materials
Elastomeric Seals: PTFE, FEP, PEEK

SYSTEMS CLASSIFICATIONS:
Dewaxing Skid:
Components: Vessels, pumps, vacuum pumps, falling film evaporator, filter
Type: Direct Impact
Documentation: GEP Startup, Commissioning, Qualification

Off Skid Components:

Chiller 1
Chiller 2
Heater 1
Documentation: GEP Startup, Commissioning, Qualification

CLEANABILITY:
Surface Finishes: 0.8 µm or better on all contact surfaces
Welds: Ground, argon purged
Fittings: Sanitary
CIP: Sprayball, low point fluid exit
CIP: External


General Specifications

CERTIFICATIONS:
ETL, UL 508A Stamped; CE; PED; NA

REQUIRED, SOLD SEPARATELY:
e-140 #10-0063 (240V) | #10-0099 (380V) OR
e-180 #10-0010 (240V) | #10-0147 (380V)
E2Di #10-0174 (240) | $10-0175 (380V)
Interface Vessel #10-0199 (240V) | #10-0200 (380V)

RECOMMENDED, SOLD SEPARATELY:
Heater/Chiller, 1-zone, 6 kW/10.2 kW #80-4423 (240V) | #80-4424 (380V)
Chiller 2: 5hp, 35.2A #80-4018 (240V) | #40-4097 (380V)
Heater 2: 36kW, Recirculating Oil #80-4096 (240/380V)
CIP Unit #10-0197 (240V) | #10-0198 (380V)

ALSO AVAILABLE, SOLD SEPARATELY:
Factory Acceptance Test (FAT); Site Acceptance Test (SAT); Design Qualification (DQ); Installation Qualification (IQ); Operational Qualification (OQ); GMP Documentation Package; Commissioning and Training Package; Maintenance Package (12 Months)

WARRANTY:
12 months for quality, labor, parts, and workmanship on United Science equipment.


related equipment


schedule jam session